5,200m3 TRAILING-SUCTION HOPPER DREDGER
IN OIL & GAS SERVICE
Investor Name:
Published Date:
January 1, 1970
Location:
Value:
Architecture:
About Project
PRINCIPAL CHARACTERISTICS
Built by IHC Sliedrecht Holland – 1994
Depth 7.8metres
Hall Length – 121metres
Hull Width – 21metres
Average Draught – 6.6metres
Maximum Dredging Depth – 45metres
Total Installed Engine Power – 9575kw
1 NAME OF EQUIPMENT : 5,200m3 TRAILING-SUCTION HOPPER DREDGER
2 OWNER/PARTNER : FIRST-ADASA GROUP LIMITED /TEEREMAX OFFSHORE OIL SERVICES LTD.
3 MARINE MANAGER : BENJAMIN E. EDAFEYOMA/JAMES SHI
4 YEAR BUILT : 1994
5 TYPE/MODEL : HOPPER SUCTION DREDGER
6 FLAG : CHINA
7 CLASSIFICATION : UNRESTRICTED NAVIGATION
8 MAIN DIMENSIONS : LOA: 121m; Depth: 7.8meters; Breadth: 21meters; GRT: 6,369T; Draft: 7.8m; Speed Loaded: 14.5knots
9 MACHINERY AND POWER : Total Installed Engine Power: 9575Kw; Submerged Pump: 1100Kw x2; Power on Jet pump; 4400Kw x2
10 OPERATING PARAMETERS : Dredges up to 45 meters deep. Hopper capacity; 5200m3 , discharge pipe diameter; 900m, Suction pipe diameter 900mm
11 MOORING AND POSITIONING SYSTEMS : Self Propelled
12 DISCHARGE CAPACITY : 5,200m3 /hr depending on conditions